强迫卸货
Afterwards the piping was occurred in its dam body and collapsed in the dam slope. It was decided on site to take the measure of forced discharge by excavating dam body for this emergency. The execution and the construction technique are described in this paper.
某小型水库在遭受强暴雨袭击后,坝体发生管涌,坝坡坍塌,现场决定采取坝体开挖强制放水法消除险情。
英语网 · 双语娱乐资讯
英语网 · 初中英语作文
英语网 · 英语词汇